News | National
6 Jul 2025 16:13
NZCity News
NZCity CalculatorReturn to NZCity

  • Start Page
  • Personalise
  • Sport
  • Weather
  • Finance
  • Shopping
  • Jobs
  • Horoscopes
  • Lotto Results
  • Photo Gallery
  • Site Gallery
  • TVNow
  • Dating
  • SearchNZ
  • NZSearch
  • Crime.co.nz
  • RugbyLeague
  • Make Home
  • About NZCity
  • Contact NZCity
  • Your Privacy
  • Advertising
  • Login
  • Join for Free

  •   Home > News > National

    NZ will soon have no real interisland rail-ferry link – why are we so bad at infrastructure planning?

    The Cook Strait ferry fiasco is just another symptom of a wider malaise: an inability to deliver, on time and at cost, the infrastructure that keeps the economy moving.

    Timothy Welch, Senior Lecturer in Urban Planning, University of Auckland, Waipapa Taumata Rau
    The Conversation


    InterIslander
    InterIslander

    Another week, another Cook Strait ferry breakdown. As the winter maintenance season approaches and the Aratere prepares for its final months of service, New Zealand faces a self-imposed crisis.

    The government has spent NZ$507.3 million on cancelled iReX ferry plans, the country’s fleet has an average age of 28 years, and the earliest New Zealanders can hope for promised replacements is 2029.

    The Marlborough Chamber of Commerce warns unreliable ferries already shake tourist confidence. Several more years of duct-tape solutions won’t help.

    The recent pattern of breakdowns and cancellations has become so routine that New Zealand risks normalising what should be viewed as a national crisis: a serious infrastructure failure.

    It is also a textbook example of how short-term political cycles, coupled with chronic under-investment, create far more expensive problems than the ones they promise to solve.

    Cost blowouts

    While ministers claim to have spared taxpayers a $4 billion blowout on new ferries, Treasury papers show almost 80% of the cost escalation lay in seismic upgrades for wharves, not in the vessels themselves. Those land-side works will be required no matter what ferries the country eventually orders.

    Justifying the original contract cancellation, Finance Minister Nicola Willis quipped that iReX was a Ferrari when a Toyota Corolla would do. But the cost of finding a suitable Corolla is adding up fast.

    Annual maintenance costs are projected to nearly double to $65 million, just to keep the existing ageing ferries running. Additionally, $300 million had to be earmarked to cover fees for breaking the original ferry replacement contract.

    By retiring the Aratere this year – New Zealand’s only rail-capable ferry – the government is also severing the interisland rail link for almost five years.

    KiwiRail will “road-bridge” rail freight, an expensive workaround that involves loading train cars onto trucks, putting those trucks on ferries, then reversing the process at the other end. This will increase truck traffic, produce more emissions and add more wear to already strained infrastructure.

    Forcing more than $14 billion worth of annual freight from rail to road could also negatively affect New Zealand’s climate change commitments. Freight moved by rail generates only about 25% of the CO2 per tonne-kilometre of the same load produced when hauled by truck.

    The cancelled hybrid ferries would have also cut emissions by 40%. Instead, New Zealand is locking in higher emissions for another half decade or longer.

    Unrealistic timelines

    The ferry saga reflects New Zealand’s infrastructure problem in a nutshell. The country tends to underestimate costs, create unfeasible timelines, then shows dismay when projects blow up or limp home at double the price.

    Auckland exemplifies the pattern. The city has seen decades of cancelled harbour crossing proposals and a scrapped light rail project, with nothing to show but consultancy fees.

    When New Zealand does build –Transmission Gully, for example – the final bill bears little resemblance to initial quotes. The 27 kilometre motorway north of Wellington was nearly 50% over budget and took eight years to build – two years longer than promised.

    The systematic underestimation of costs reflects a flawed approach to infrastructure planning. Politicians need quick wins within three-year electoral cycles, while infrastructure projects take decades to deliver.

    Projects are approved based on lowball estimates, with the outcome inherited by another administration. This has crossed party lines and created a system that rewards short-term thinking and punishes long-term planning.

    Just consider the second crossing for Auckland Harbour. For 35 years, the government has commissioned study after study – from the 1988 tunnel plans to the 2010 business cases – each time backing away when the price tag appeared, or the government changed.

    The iReX cancellation marks the first time the government has actually signed contracts and then walked away. As with the second Auckland Harbour crossing, each delay has only made the inevitable solution more expensive.

    Other countries have, to a degree, addressed this problem. Infrastructure Australia, for example, provides independent cost assessments and long-term planning that transcends political cycles. New Zealand’s Infrastructure Commission, established in 2019, lacks similar teeth and independence.

    Ultimately this isn’t really about ferries. It’s about how New Zealand consistently fails to deliver, on time and at cost, the infrastructure that keeps its economy moving.

    The Conversation

    Timothy Welch does not work for, consult, own shares in or receive funding from any company or organisation that would benefit from this article, and has disclosed no relevant affiliations beyond their academic appointment.

    This article is republished from The Conversation under a Creative Commons license.
    © 2025 TheConversation, NZCity

     Other National News
     06 Jul: Parts of State Highway Three are being cleared, after flooding and slips, in Taranaki
     06 Jul: The Steel are desperate to beat the Mystics in Auckland this afternoon and continue a late-season charge for a play-off spot in the ANZ Premiership
     06 Jul: Coastguard's reminding boaties to log bar crossings, after five people were rescued in North Canterbury last night
     06 Jul: A Police investigation's underway, after a man died on a hunting trip on Stewart Island
     06 Jul: Scott Robertson is praising the impact of the All Blacks' four debutants in their scratchy 31-27 win over France in Dunedin
     06 Jul: A homicide investigation is underway following the death of a baby found with critical injuries at a Foxton Beach House
     06 Jul: Silver Ferns defender Parris Mason has been hospitalised as a precaution after suffering a neck injury in the Central Pulse's 65-44 ANZ Premiership victory over the Stars in Wellington
     Top Stories

    RUGBY RUGBY
    Scott Robertson is praising the impact of the All Blacks' four debutants in their scratchy 31-27 win over France in Dunedin More...


    BUSINESS BUSINESS
    Our newsroom's revealed more than 200 people were able to enter New Zealand on work visas for defunct businesses later exposed as fronts for a network of cannabis grow houses in Auckland More...



     Today's News

    International:
    Tour de France stage 1 chaotic as crashes and echelons hit main contenders 16:07

    Entertainment:
    Sean 'Diddy' Combs trial has been branded a "total failure" of the justice system 16:06

    Entertainment:
    Joshua Jackson and Eric Mabius "blushed scarlet red" when they bumped into each other "years" after their steamy gay sex scene in 'Cruel Intentions' 15:36

    Accident and Emergency:
    Parts of State Highway Three are being cleared, after flooding and slips, in Taranaki 15:27

    Entertainment:
    Charlize Theron has spoken candidly about her sex life aged 49 15:06

    Rugby League:
    Tragedy has hit the Queensland State of Origin camp days out from the series decider against New South Wales in Sydney 14:57

    International:
    Texas floods leave dozens dead, including children, as search continues for campers 14:47

    Entertainment:
    Sean Combs fell to his knees in a Manhattan courtroom as his trial verdict was read out, with legal experts calling the prosecution's case "a complete and total failure" 14:36

    International:
    Pakistan apartment collapse kills residents in impoverished Karachi neighbourhood 14:17

    Netball:
    The Steel are desperate to beat the Mystics in Auckland this afternoon and continue a late-season charge for a play-off spot in the ANZ Premiership 14:07


     News Search






    Power Search


    © 2025 New Zealand City Ltd